The ENC Group is a group of professionals and associates with years of extensive experience in engineering, design, construction, and management, of complex capital improvement projects in processing plants and facilities. We have performed feasibility studies, scheduling, permitting, construction inspections, code review, and assessments, for major corporations in the United States and internationally. The ENC Group has made key contributions in the following successful projects:

   

500 TPD O2 Process Plant Relocation and Upgrade for an International Precious Metal         Company

 

340 TPD O2 Process Plant Upgrade for International Steel Mill

 

Boiler House Repairs and Modifications

  *         Low pressure 20 inch steam line modifications and replacement

  *         Medium pressure (420 PSIG)  to low pressure (15 PSIG) pressure reducing valve station

  *         Repair and replacement of the boiler house first floor

  *         Building modifications for the installation of a new medium pressure boiler and economizer

  *         Boiler house column repair for the vintage boiler house – year built 1911 & 1922

  *         Steam turbine, bull gear and foundation design for 4 MW steam turbine generator set

  *         Silencer project

 

Chilled Water Piping – Utility Project to provide Chilled Water to Casino Operation

 

Cold Box Modifications and Redesign for Process Plant Conversion and Relocation

 

Construction Cost Estimates and Construction Schedules for Philadelphia Subway System         Improvements – Phase I and II

 

350 TPD O2 Cold Box Relocation from Sweden to India

 

Granulated Sugar Product Conveying System Improvements from 65 Tons per hour to 85 Tons per         hour, with product screening and silo discharge improvements.

 

Argon Gas Recovery System Vent Condenser Design and Construction Documents

 

Power House Modifications for Noise Reduction

 

Cooling Tower Replacement Project

 

Powdered Metal Mixing Tower Equipment Evaluation

 

Powdered Metal Blending Tests

 

Granulated Sugar Bulk Truck Unloading System

 

Air Cooler and Nitrogen Gas Heat Exchanger Modifications & Construction Supervision

 

Analytical Evaluation of High Temperature Scrubber

 

350,000 GPM Cooling System Piping Modifications and Equipment Installations

 

Cemetious Blending & Materials Handling Facility Expansion

 

Process Facility Shutdown Planning & Scheduling

 

Blending Facility Design including Silos, Conveyors, Scales, Hoppers for Specialty Manufacturer.

 

Preliminary Design & Construction Cost Estimates for $35 Million Facility Expansion

 

Building Repairs & Process Safety Improvements after Powder Mill Explosion

 

Boiler Treatment System Replacement

 

Power House Deaerator & Softener Replacement

 

Industrial Ventilation System  - OSHA Engineering Controls

 

Industrial Ventilation System Field Inspections, Tests and Preliminary Engineering for Smelting        Operation.

 

Industrial Ventilation – Dust Collection & Control System

 

600 TPD O2 Facility ExpansionNortheastern  United States

 

Cooling Tower Inspections, Thermal Upgrades, Structural Inspections and Replacements on         Existing Cold Water Basins.