v 340 TPD O2 Process
Plant Upgrade for International Steel Mill
v Boiler House Repairs and Modifications
Low pressure 20 inch steam line modifications
and replacement
Medium pressure (420 PSIG) to low pressure (15 PSIG) pressure reducing
valve station
Repair and replacement of the boiler house first
floor
Building modifications for the installation of a
new medium pressure boiler and economizer
Boiler house column repair for the vintage
boiler house – year built 1911 & 1922
Steam turbine, bull gear and foundation design
for 4 MW steam turbine generator set
Silencer project
v Chilled Water Piping – Utility
Project to provide Chilled Water to Casino Operation
v Cold Box Modifications and Redesign for Process
Plant Conversion and Relocation
v Construction Cost Estimates and Construction
Schedules for Philadelphia
Subway System Improvements – Phase I and II
v 350 TPD O2 Cold Box Relocation from Sweden to India
v Granulated Sugar Product Conveying System
Improvements from 65 Tons per hour to 85 Tons per hour, with product screening
and silo discharge improvements.
v Argon Gas Recovery System Vent Condenser Design
and Construction Documents
v Power House Modifications for Noise Reduction
v Cooling Tower Replacement Project
v Powdered Metal Mixing Tower Equipment Evaluation
v Powdered Metal Blending Tests
v Granulated Sugar Bulk Truck Unloading System
v Air Cooler and Nitrogen Gas Heat Exchanger
Modifications & Construction Supervision
v Analytical Evaluation of High Temperature
Scrubber
v 350,000 GPM Cooling System Piping Modifications
and Equipment Installations
v Cemetious Blending & Materials Handling
Facility Expansion
v Process Facility Shutdown Planning & Scheduling
v Blending Facility Design including Silos, Conveyors,
Scales, Hoppers for Specialty Manufacturer.
v Preliminary Design & Construction Cost Estimates for $35 Million Facility
Expansion
v Building Repairs & Process Safety
Improvements after Powder Mill Explosion
v Boiler Treatment System
Replacement
v Power House Deaerator
& Softener Replacement
v Industrial Ventilation
System - OSHA Engineering Controls
v Industrial Ventilation
System Field Inspections, Tests and Preliminary Engineering for Smelting
Operation.
v Industrial Ventilation –
Dust Collection & Control System
v 600 TPD O2 Facility
Expansion
– Northeastern United
States
v Cooling Tower
Inspections, Thermal Upgrades, Structural Inspections and Replacements
on Existing
Cold Water Basins.
|